Wednesday, 23 March 2011

Deadlines

The Deadline for the Music Video and Ancillary tasks is one Friday 25th March whereas the blog has to be completed by the end of the easter holidays. The Video is near completion and finishing touches are being put to my ancillary tasks. It seems that our groups work will be in on time without any flaws.
Here is a copy of my consert ticket which I have added some other features. These features include the Tinie Tempah logo which links this ancillary task to other ones that my group have created. I have also added a picture of the artist but have added a fade effect because it makes the ticket look much more dynamic. Below is the picture that I used.

Video Editing


Above is a picture of myself undergoing some video editing. This picture was taken on the 21st March, on this day I decided to fill in a few gaps in the music video. I inserted some footage of Tinie Tempah performing infront of a piece of graffiti which added some mise-en-scene to the film which suited the genre of music. Below is an example of the type of shot which was used.

Sunday, 20 March 2011




Here is a comparisson between three of the same the posters. As you can see there has been great progress between the first draft to the latest, there are now more effects used such as the fade used on Eric Turner's face and a few extras. These extras include adding places where you can find Tinie Tempah such as his website and other social networking sites like Facebook and Twitter. I have also resized and changed some images  to make the poster look more professional.

Here are my ancillary task tickets before and after. As you can see there are many significant changes between the two products, these changes include moving the image of the O2 Arena from the right hand side of the ticket to the bottom centre. I chose to move this picture because it looks more appealing by the way the fade added makes it look as if the stars are directly above the O2 Arena which links the title of the tour name. In the before picture you can see that the Tinie Tempah logo is incorporated within the ticket but is over used and makes the ticket look tacky and unprofessional. Also I have added another barcode to the main part of the ticket to make the product look as close as possible to an original copy. 

Thursday, 17 March 2011

Evaluation of Filming 16/03/11


This is a video of me talking through what happened during filming on Erith Pier. In this video I explain why we as a group have chosen this location and what type of shots we have used.

16th March 2011 Filming

On the 16th of March my group and I decided to go filming at two separate locations. The first was at Erith Pier, we filmed at this location because it was an urban setting which is the right setting for the R&B genre. The second setting was at a Bexleyheath skate park, we used this setting because it had a few pieces of graffiti around the area which also match the genre of music. Below is evidence of our work.